HID 31-0003-01 LED Lens 3mm DOME360 Long Lead | Aztek Computers

HID 31-0003-01 LED Lens 3mm DOME360 Long Lead

SKU: ES0FB48CSW |  Mfg. Part: 31-0003-01  |  0 Reviews  |  Share

Special Order
Ships in 1-2 weeks

Condition: New

$32.34  $43.66
 Free Shipping for this Item

Product Overview

This is the HID 31-0003-01 LED Lens, designed with a 3mm dome shape for a 360-degree light dispersion. It features long leads for convenient and versatile integration into various applications. The lens is specifically crafted to optimize the performance of your LEDs, ensuring widespread illumination.

Technical Specifications

Part Number31-0003-01
BrandHID
TypeLED Lens
Shape3mm Dome
Dispersion360 Degree
Lead LengthLong

Product Details

  • Manufacturer:
  • Model Number:
  • Condition:
  • Shipping Weight:
  • Package Size:
  • Category:
  • Date First Available:
Request a quote for Hid 31-0003-01
Volume pricing, formal quotes for purchase orders, or several items at once.
Request a quote

Reviews for Hid 31-0003-01

$32.34